Project Description
CHIPITA FACTORY
EXTENSION IN LAMIA
The factory of Chipita was extended lengthwise, with the addition of a total area of 8.000m² in Lamia. The final MEP installation design was challenging because of the complex processes that take place in the factory. The MEP design was based on these processes.
The design took place 1995 and the factory is operating perfectly to this day.